Upper South Creek Brine Pipeline

Upper South Creek Brine Pipeline

Greg Fulmer

|

April 9, 2025

Client

John Holland (for Sydney Water)

Location

Kemps Creek to Cabramatta, NSW

Value

$13 million

Completed

November 2024

Construction workers install a large black pipe in a trench using heavy machinery, with safety barriers, fencing, and caution tape set up around the worksite.Construction workers install a large black pipe in a trench using heavy machinery, with safety barriers, fencing, and caution tape set up around the worksite.
A large pipeline covered with steel rebar is being installed in a trench at a construction site with a truck and equipment in the background.A large pipeline covered with steel rebar is being installed in a trench at a construction site with a truck and equipment in the background.
Two construction workers wearing safety gear are working inside a deep trench secured with red barriers and metal ladders at a construction site.Two construction workers wearing safety gear are working inside a deep trench secured with red barriers and metal ladders at a construction site.
A worker in high-visibility gear stands in a deep trench with red safety panels, beside a large vertical pipe secured with blue straps and surrounded by metal framework.A worker in high-visibility gear stands in a deep trench with red safety panels, beside a large vertical pipe secured with blue straps and surrounded by metal framework.
Two construction workers in safety gear stand in a trench beside a large concrete pipe being lowered into place with straps and scaffolding around.Two construction workers in safety gear stand in a trench beside a large concrete pipe being lowered into place with straps and scaffolding around.
A deep trench runs along a road under construction, with safety barriers, orange cones, and a Komatsu excavator on site.A deep trench runs along a road under construction, with safety barriers, orange cones, and a Komatsu excavator on site.
A worker in safety gear installs or inspects a large black pipeline in a muddy trench, surrounded by construction barriers and sandbags.A worker in safety gear installs or inspects a large black pipeline in a muddy trench, surrounded by construction barriers and sandbags.
Construction site with red trench box, fencing, and an excavator in the background. Workers are present near the equipment, and trees are visible behind the site.Construction site with red trench box, fencing, and an excavator in the background. Workers are present near the equipment, and trees are visible behind the site.

Project Overview

Upper South Creek brine pipeline, 14.3km through rural and urban ground

RA Smith Contracting built the Upper South Creek brine pipeline for John Holland as a subcontractor on Sydney Water's Advanced Recycling Centre project. The $13 million package covered 14.3km of DN375 OPVC pipeline across rural and urban ground. 

The pipeline carries brine, a byproduct of the recycling process, to its discharge points. The team also placed 69 appurtenances, built 25 cast in-situ scour bases, then tested and commissioned the line. Work like this is part of our water construction services. 

Sydney Water's Upper South Creek program delivers wastewater infrastructure for the Western Sydney region. 

Completed November 2024

The Challenge

Farmland, city streets and live Sydney Water assets

The pipeline ran through farmland and built-up areas. On rural stretches, the crew worked with property owners on site access and livestock safety. In urban areas, council traffic requirements applied, and trenching in school zones and on major roads took place at night. 

Sydney Water maintenance holes and pump scour chambers sat along the route. Working safely around them took a purpose-built barrier system. 

Council and Sydney Water environmental requirements covered the whole alignment, including erosion, sediment and waterway protection. 

The Solution

Coordinated access, a purpose-built barrier and environmental controls

RA Smith worked with John Holland, Sydney Water, property owners and councils to line up access and approvals. 

Access and livestock. Temporary fencing protected livestock and kept access open for property owners. 

Night work. Trenching in school zones and on major roads took place at night. 

Barrier system. RA Smith's Managing Director designed a barrier system for working safely around Sydney Water maintenance holes and pump scour chambers. 

Environmental control. Erosion control, sediment management and waterway protection met council and Sydney Water requirements. 

Project Outcome

14.3km of brine pipeline tested and commissioned

RA Smith delivered, tested and commissioned the 14.3km brine pipeline to Sydney Water's specifications.

Key Outcomes

  • 14.3km of DN375 OPVC brine pipeline installed 
  • 69 appurtenances placed, including hydrants, air valves, jetting points and scours 
  • 25 cast in-situ scour bases built 
  • Pipeline tested and commissioned to Sydney Water specifications 
  • Access, livestock and traffic managed across rural and urban stretches 
  • Environmental requirements met along the alignment

John Holland later re-engaged RA Smith on further projects. Our Integrated Management System is third party accredited to AS/NZS ISO 9001:2015, ISO 45001:2018 and ISO 14001:2015.

Technical Scope

What the works involved

Brine Pipeline

  • 14.3km of DN375 OPVC pipeline across rural and urban environments 
  • 69 appurtenances, including hydrants, air valves, jetting points and scours 
  • 25 cast in-situ scour bases 
  • Testing and commissioning to Sydney Water specifications 

Site and Environmental Management

  • Temporary fencing for livestock safety and property access 
  • Traffic management, with trenching in school zones and on major roads at night 
  • Erosion control, sediment management and waterway protection 
  • Barrier system for work around Sydney Water maintenance holes and pump scour chambers

FAQs

Upper South Creek Brine Pipeline FAQs

What did RA Smith build on the Upper South Creek brine pipeline?

RA Smith installed 14.3km of DN375 OPVC brine pipeline for John Holland on Sydney Water's Upper South Creek Advanced Recycling Centre project, then tested and commissioned it.

What is on the brine pipeline besides the pipe?

The pipeline has 69 appurtenances, including hydrants, air valves, jetting points and scours, plus 25 cast in-situ scour bases.

What does the Upper South Creek brine pipeline carry?

It carries brine, a byproduct of the recycling process, to designated discharge points.

How did RA Smith work safely around Sydney Water maintenance holes?

RA Smith's Managing Director designed a barrier system for working safely around Sydney Water maintenance holes and pump scour chambers.

Who was RA Smith's client on the Upper South Creek brine pipeline?

RA Smith worked as a subcontractor to John Holland on Sydney Water's Upper South Creek Advanced Recycling Centre project.

Our Projects