RA Smith realigned a section of the Balmain Slopes Sewer, completing deep excavation and micro-tunnelling in a densely populated area on time with minimal disruption to residents.
Pipeline Installation:
400m DN750 GRP replacing rock-lined sewer tunnel.
Shaft Excavation:
Shafts 4–14m deep in rock using telescopic clamshell excavator.
FIFM Planning:
Complex connections into 8m-deep shaft over live sewer tunnel.
R A Smith Contracting was engaged by Legacy Property to undertake Sydney Water’s requirements for the realignment of existing sewer infrastructure, as well as to address the extensive preparatory activities necessary for future development.
RA Smith delivered water, sewer, fire, stormwater, HV, LV, and street lighting works for the Moorebank Terminal Precinct, ensuring seamless integration with ongoing projects.
RA Smith realigned a section of the Balmain Slopes Sewer, completing deep excavation and micro-tunnelling in a densely populated area on time with minimal disruption to residents.