Sewer, Water Infrastructure

Upper South Creek Advanced Recycling Centre

Client

John Holland

Location

Kemps Creek, Cabramatta

Value

$21 Million

Completed

November 2024

Construction workers install a large black pipe in a trench using heavy machinery, with safety barriers, fencing, and caution tape set up around the worksite.Construction workers install a large black pipe in a trench using heavy machinery, with safety barriers, fencing, and caution tape set up around the worksite.
A large pipeline covered with steel rebar is being installed in a trench at a construction site with a truck and equipment in the background.A large pipeline covered with steel rebar is being installed in a trench at a construction site with a truck and equipment in the background.
Two construction workers wearing safety gear are working inside a deep trench secured with red barriers and metal ladders at a construction site.Two construction workers wearing safety gear are working inside a deep trench secured with red barriers and metal ladders at a construction site.
A worker in high-visibility gear stands in a deep trench with red safety panels, beside a large vertical pipe secured with blue straps and surrounded by metal framework.A worker in high-visibility gear stands in a deep trench with red safety panels, beside a large vertical pipe secured with blue straps and surrounded by metal framework.
Two construction workers in safety gear stand in a trench beside a large concrete pipe being lowered into place with straps and scaffolding around.Two construction workers in safety gear stand in a trench beside a large concrete pipe being lowered into place with straps and scaffolding around.
A deep trench runs along a road under construction, with safety barriers, orange cones, and a Komatsu excavator on site.A deep trench runs along a road under construction, with safety barriers, orange cones, and a Komatsu excavator on site.
A worker in safety gear installs or inspects a large black pipeline in a muddy trench, surrounded by construction barriers and sandbags.A worker in safety gear installs or inspects a large black pipeline in a muddy trench, surrounded by construction barriers and sandbags.
Construction site with red trench box, fencing, and an excavator in the background. Workers are present near the equipment, and trees are visible behind the site.Construction site with red trench box, fencing, and an excavator in the background. Workers are present near the equipment, and trees are visible behind the site.
RA Smith Contracting partnered with John Holland to deliver 15.4km of treated water and brine pipelines from Kemps Creek to Cabramatta.

Pipeline Installation:

1.1km DN914 MSCL, 14.3km DN375 OPVC.

Details and Fittings:

69 appurtenances (hydrants, air valves, jetting points, scours) and 25 scour bases.

Traffic Management:

Night work for trenching in school zones and major roads.