Sewer Infrastructure

The Oaks Rising Main

Client

Western Region Delivery Team - Sydney Water Consortium

Location

The Oaks

Value

$6.55 Million

Completed

November 2021

A construction site with a long, narrow trench running alongside a road, containing a large pipe. An excavator and workers are present, with safety barriers set up.A construction site with a long, narrow trench running alongside a road, containing a large pipe. An excavator and workers are present, with safety barriers set up.
A large black pipe wrapped at one end with blue material is secured in a trench, supported by sandbags and red safety barriers on both sides.A large black pipe wrapped at one end with blue material is secured in a trench, supported by sandbags and red safety barriers on both sides.
A newly installed blue water valve assembly is positioned in a trench with red support barriers on either side, surrounded by bolts and construction materials.A newly installed blue water valve assembly is positioned in a trench with red support barriers on either side, surrounded by bolts and construction materials.
A large black pipe with blue fittings and electronic sensors is installed in a trench, surrounded by soil and scattered debris.A large black pipe with blue fittings and electronic sensors is installed in a trench, surrounded by soil and scattered debris.
A concrete pit containing white PVC and blue metal pipes, valves, a cylindrical filter, and yellow metal ladder steps mounted on the wall.A concrete pit containing white PVC and blue metal pipes, valves, a cylindrical filter, and yellow metal ladder steps mounted on the wall.
Large blue pipes and valves are installed in a trench, with tools and sandbags placed on top, indicating ongoing utility or water line construction work.Large blue pipes and valves are installed in a trench, with tools and sandbags placed on top, indicating ongoing utility or water line construction work.
RA Smith installed 6.7km of PE sewer rising main, ensuring daily road reopening and smooth construction progress.

Pipe Installation:

Open trenching, micro-tunneling, and bridge works.

Structural Integration:

Vent stacks, flow valves, and maintenance holes.

Road Reinstatement:

Permanent hot-mix surfacing delivered.