Civil, Sewer, Stormwater, Water Infrastructure

Parramatta Light Rail

Client

CPB/Downer

Location

Kemps Creek, Cabramatta

Value

$12.7 Million

Completed

August 2022

A yellow excavator is parked on a construction site, surrounded by orange barriers and fencing, with trees and buildings in the background.A yellow excavator is parked on a construction site, surrounded by orange barriers and fencing, with trees and buildings in the background.
Four large concrete pipes are being installed underground at a construction site, with heavy machinery and safety barriers visible in the background.Four large concrete pipes are being installed underground at a construction site, with heavy machinery and safety barriers visible in the background.
A construction site with an open trench, exposed orange pipe, construction vehicles, safety barriers, and warning flags along a partially completed road.A construction site with an open trench, exposed orange pipe, construction vehicles, safety barriers, and warning flags along a partially completed road.
Steel and wooden shoring supports reinforce an excavation site with wet soil at the bottom, surrounded by construction materials and safety railings.Steel and wooden shoring supports reinforce an excavation site with wet soil at the bottom, surrounded by construction materials and safety railings.
A construction worker operates a road roller on a sandy road under repair, with safety barriers and fencing on both sides.A construction worker operates a road roller on a sandy road under repair, with safety barriers and fencing on both sides.
A construction worker in a fluorescent vest works on a pipeline installation inside a deep, reinforced excavation site filled with soil and metal supports.A construction worker in a fluorescent vest works on a pipeline installation inside a deep, reinforced excavation site filled with soil and metal supports.
A construction trench with red support beams and metal rebar reinforcement inside, surrounded by safety barriers.A construction trench with red support beams and metal rebar reinforcement inside, surrounded by safety barriers.
RA Smith managed utility relocations and civil works in Parramatta CBD, ensuring seamless delivery with no damage to services.

Sewer Relocation:

26m OD710 PE pipes and maintenance holes.

Water & Gas:

320m water mains and 220m gas sleeves.

Civil Works:

Telstra, stormwater, and sub-grade prep.

Electrical:

Relocation of Endeavour electrical HV, LV, and street lighting.