Sewer, Water Infrastructure

ARTC Inland Rail

Client

ARTC Inland Rail

Location

Olympic Highway

Value

$4.3 Million

Completed

September 2024

Construction workers and vehicles, including a white truck and excavator, are present at a work site near a railway track with safety barriers and equipment.Construction workers and vehicles, including a white truck and excavator, are present at a work site near a railway track with safety barriers and equipment.
A construction site with a large steel beam above a trench, a pipe laid on wooden supports, and safety barriers surrounding the area.A construction site with a large steel beam above a trench, a pipe laid on wooden supports, and safety barriers surrounding the area.
Two construction workers in safety gear work inside a reinforced excavation site with pipes, gravel, and equipment visible around them.Two construction workers in safety gear work inside a reinforced excavation site with pipes, gravel, and equipment visible around them.
Two trucks and workers are positioned near a roadside construction site beside a set of railway tracks, with houses and trees in the background under a partly cloudy sky.Two trucks and workers are positioned near a roadside construction site beside a set of railway tracks, with houses and trees in the background under a partly cloudy sky.
A construction site beside a railway features trucks, barriers, workers in safety gear, and construction equipment along a partially closed road.A construction site beside a railway features trucks, barriers, workers in safety gear, and construction equipment along a partially closed road.
RA Smith delivered water, sewer, and gas relocations for the ARTC Inland Rail project, meeting deadlines despite significant challenges.

Water Main:

88m DN375 MSCL under live rail and 62m across Olympic Hwy.

Sewer Installation:

45m via micro tunnelling and 10m open cut.

Gas Line:

82m bored with DN250 PE sleeve.

Groundwater Control:

Managed unexpected inflows with sediment tanks.