Civil, Sewer, Stormwater, Water Infrastructure

Moorebank Intermodal Freight Terminal

Client

Georgiou

Location

Moorebank

Value

$11 Million

Completed

July 2022

A construction site with blue industrial pipes connected to a large storage tank, an orange excavator, and exposed ground.A construction site with blue industrial pipes connected to a large storage tank, an orange excavator, and exposed ground.
Two construction workers in safety gear work near large metal tanks; one operates a small road roller on a dirt surface, while the other works near blue pipes and site equipment.Two construction workers in safety gear work near large metal tanks; one operates a small road roller on a dirt surface, while the other works near blue pipes and site equipment.
Industrial site with large pipes wrapped in blue plastic, concrete barriers, safety railings, and a building with yellow accents in the background under a partly cloudy sky.Industrial site with large pipes wrapped in blue plastic, concrete barriers, safety railings, and a building with yellow accents in the background under a partly cloudy sky.
A construction vehicle lifts a large green cylindrical tank over a dirt excavation site under a partly cloudy sky.A construction vehicle lifts a large green cylindrical tank over a dirt excavation site under a partly cloudy sky.
A large green underground water tank is being installed at a construction site, with an excavator and construction materials visible in the background.A large green underground water tank is being installed at a construction site, with an excavator and construction materials visible in the background.
Construction worker in blue coveralls installs large green storage tanks in a trench as a yellow excavator operates nearby on a construction site.Construction worker in blue coveralls installs large green storage tanks in a trench as a yellow excavator operates nearby on a construction site.
Construction workers in high-visibility clothing install orange utility pipes in a trench, surrounded by dirt and construction equipment.Construction workers in high-visibility clothing install orange utility pipes in a trench, surrounded by dirt and construction equipment.
Construction workers in high-visibility clothing install large concrete utility boxes in a trench at a worksite using a crane. Safety barriers and vehicles are visible in the background.Construction workers in high-visibility clothing install large concrete utility boxes in a trench at a worksite using a crane. Safety barriers and vehicles are visible in the background.
Excavators and construction vehicles work at a construction site with a large concrete pipe being installed in a deep trench.Excavators and construction vehicles work at a construction site with a large concrete pipe being installed in a deep trench.
A series of blue industrial pipes and valves connected to a building, with additional black and orange pipes running underground in a trench.A series of blue industrial pipes and valves connected to a building, with additional black and orange pipes running underground in a trench.
RA Smith delivered water, sewer, fire, stormwater, HV, LV, and street lighting works for the Moorebank Terminal Precinct, ensuring seamless integration with ongoing projects.

Pipe Installation:

6.9km water, 4.6km sewer, 5.1km fire, 4.2km stormwater, 8.7km HV/LV lines.

Sewer Pump Station:

32 x 10,000L pumps with 26,000L tanks.

Water Tanks:

2 potable tanks (600,000L total), with pipes, valves, and pumps.